Hamed Tofighzadeh

*Adventurer
*Technology Enthusiast
*Mountaineer
*Movie Enthusiast


Hamed Tofighzadeh

Execution of a standalone rack reorganization project, including structured cabling, infrastructure optimization, and alignment with data center best practices at the National Banking Complex
๐Ÿ“… 11 Jan 2026

2 weeks ago | [YT] | 3

Hamed Tofighzadeh

Unboxing an MSI All-in-One desktop, followed by Windows installation and full setup of antivirus and essential software applications and ...
๐Ÿ–ฅ
Additionally, unboxing an HP LaserJet M406 printer with complete installation and configuration.
๐Ÿ–จ
๐Ÿ“… 15 Feb 2026

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

Internal Network Cabling & Duct Installation Project
Successfully completed an internal internet cabling and ducting project, focused on structured cable routing, proper installation of cable ducts, and comprehensive cable organization.
This project aimed to improve network reliability, enhance safety standards, and create a clean, well-structured infrastructure for long-term scalability and maintenance.
hashtag#NetworkInfrastructure hashtag#Cabling hashtag#ITInfrastructure hashtag#ProjectManagement
๐Ÿ“… 16 Feb 2026
๐Ÿ–ฅ

3 weeks ago | [YT] | 3

Hamed Tofighzadeh

Installation and commissioning of the cashless payment device, along with a Mobinnet modem, including full connectivity inspection and testing at Lamari Trucks.
๐Ÿšš ๐Ÿ–ฅ
๐Ÿ“… 17 Feb 2026
hashtag#pc hashtag#internet hashtag#cashless hashtag#connectivity hashtag#truck hashtag#lamsri hashtag#mobinnet

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

Performed complete disassembly and reassembly of the HP LaserJet 2055dn printer.
Conducted a full teardown of the device, replaced the fuser assembly entirely, installed a new fuser unit, and carried out comprehensive troubleshooting procedures. After resolving the issue, the printer was thoroughly tested to ensure optimal performance and then delivered to the responsible technical specialist.
๐Ÿ–ฅ ๐Ÿ–จ
Reported Issue: Vertical lines appearing on printed pages during operation.
hashtag#PC hashtag#printer hashtag#HP
๐Ÿ“… 17 Feb 2026

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

Cable routing and duct installation, cable management and organization, as well as network testing and commissioning.
hashtag#networking hashtag#pc hashtag#cable
๐Ÿ“… 18 Feb 2026
๐Ÿ–ฅ

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

Full replacement of the fuser assembly for the HP LaserJet 3015 printer, including installation and complete setup.
hashtag#printer hashtag#HP hashtag#fuser hashtag#pc
๐Ÿ–ฅ ๐Ÿ–จ
๐Ÿ“… 21 Feb 2026

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

Disassembly, complete fuser unit replacement, including spider gear, pressure roller, and drum replacement for two HP LaserJet 2055dn printers.
After reassembly, both devices were fully tested, calibrated, and restored to optimal working condition to ensure high-quality printing performance and reliability.
Another successful maintenance and repair project completed. ๐Ÿ’ช๐Ÿ–จ๏ธ
hashtag#PrinterRepair hashtag#HP hashtag#Maintenance hashtag#TechnicalSupport hashtag#OfficeEquipment
๐Ÿ–ฅ ๐Ÿ–จ
๐Ÿ“… 25 Feb 2026

3 weeks ago | [YT] | 2

Hamed Tofighzadeh

3-Day Project Completed:
๐Ÿ–ฅ ๐Ÿ–จ

Provided support for 500 computer systems, including:

ยท System setup and configuration: Windows installation, software deployment (office automation, specialized applications), domain joining, antivirus setup, and system updates
ยท Printer and scanner installation & maintenance
ยท Network troubleshooting: identifying and resolving connectivity issues, network configuration, and more
ยท Installation and setup of All-in-One devices and internet-based systems
ยท Full IT support services
ยท On-site training for building staff on system support and all related tasks

Let me know if you'd like a shorter version or a more formal/professional tone.
๐Ÿ“… 12 April 2026 ro 14 April 2026

4 weeks ago | [YT] | 2

Hamed Tofighzadeh

Rack organization project and internal cable replacement for a 48-port Cisco switch, including the implementation of two patch panels for structured cable management. The project also involved inspection, setup, and commissioning of the network for 22 systems, along with stand-alone devices and related equipment.
Date ๐Ÿ“… 22 April 2026

4 weeks ago | [YT] | 2